🌉 InfrastructureCOSTLY

How much does the Fehmarnbelt Tunnel between Germany and Denmark cost?
18 km immersed tunnel for road and rail
💡 An 18 km tunnel made of huge concrete elements sunk into the Baltic Sea – road and rail combined.
Answer
€7.1B
€7,100,000,000 · Construction cost · 2015
The tunnel is assembled from 89 huge concrete elements on the seabed. Denmark pays and recoups the cost through tolls.
DKK 52.6B at 2015 prices.
Source: Femern A/S (via Wikipedia)
Free daily game
Could you have guessed it?
5 new real-world prices every day. Guess, get scored, compare with everyone.
More infrastructure prices
- How much did the Flamanville 3 nuclear reactor in France cost?€13.2B
- How much did Boston's “Big Dig” cost?€10.7B
- How much does the Paris metro expansion “Grand Paris Express” cost?€36B
- How much did the Panama Canal expansion cost?€4.75B
- How much did the Gotthard Base Tunnel cost?€11.2B
- How much did the Golden Gate Bridge cost – back then?€32M